Details

    • Sprint:
      CFAMX 2020R4 SA Sprint 3, CFAMX 2020R4 SA Sprint 4
    • SCRUM Team:
      Globogym Purple Cobras
    • Story Points:
      2
    • Work Type Classification:
      Sustaining

      Description

      As an admin using the forecast dashboard I want to be able to select a date for which the failures occurred, so that I can fix those forecasts

      Notes

      • Use case - I come in on Monday, and I want to be able to see the failures for Saturday and Sunday
      • The date picker should be a single date, not a date range

      Acceptance Criteria

      1. Confirm that there is a date picker displayed on the Forecast Dashboard page
      2. Confirm that the default date on page load is today's date
      3. Confirm that Future dates cannot be selected
      4. Confirm that Sundays can be selected
      5. Confirm that when a date is selected, the data returned accurately reflects that date
      6. Confirm that if there is no data available a banner is displayed informing the user that there is no data available

        Attachments

          Issue Links

          There are no Sub-Tasks for this issue.

            Activity

              People

              • Assignee:
                will.englefield Will Englefield (Inactive)
                Reporter:
                will.englefield Will Englefield (Inactive)
              • Watchers:
                0 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved:

                  Time Tracking

                  Estimated:
                  Original Estimate - 14h
                  14h
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 11h 35m Time Not Required
                  11h 35m

                    PagerDuty

                    Error rendering 'com.pagerduty.jira-server-plugin:PagerDuty'. Please contact your Jira administrators.