Uploaded image for project: 'CFA MX '
  1. CFA MX
  2. CFAMX-2215

Item Maintenance > Update CSV Download to include Build To for Suggested Ordering Stores

    Details

    • Sprint:
      CFAMX 2019R2 Sprint 4
    • SCRUM Team:
      Globogym Purple Cobras

      Description

      As a Store Manager I want the Build To details to be included in the csv download so that I can analyze my data in a spreadsheet application

      Notes

      • There are two versions of the CSV download:
        • Usage Ordering Stores
        • Suggested Ordering Stores
      • Build To is currently present in the Usage Ordering view of Item Maintenance

      Acceptance Criteria

      1. Confirm that when the Build To field is displayed on Item Maintenance for Suggested Ordering stores (CFAMX-2210) the field and corresponding data is included in the CSV Download as the last column
        • When the configuration allows a Build To value to be entered, include that value in the export
          • If a Build To has not been configured for such items, include 0
        • When the configuration is such that a Build To cannot be entered for an item, include "n/a" in the CSV Downlaod
      2. Confirm that when the Build To field is NOT displayed on Item Maintenance for Suggested Ordering stores (CFAMX-2210) the field is NOT included in the CSV Download
      3. Confirm that the Build To data continues to be included in the CSV Download for Usage Ordering stores

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                will.englefield Will Englefield (Inactive)
                Reporter:
                will.englefield Will Englefield (Inactive)
              • Watchers:
                0 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved:

                  Time Tracking

                  Estimated:
                  Original Estimate - 29h 40m Original Estimate - 29h 40m
                  29h 40m
                  Remaining:
                  Time Spent - 28h Remaining Estimate - 3h
                  3h
                  Logged:
                  Time Spent - 28h Remaining Estimate - 3h
                  28h

                    PagerDuty

                    Error rendering 'com.pagerduty.jira-server-plugin:PagerDuty'. Please contact your Jira administrators.