Execute Load Test for 2019R1 Post Testing Defects

    Details

    • Sprint:
      CFAMX 2019R2 Sprint 3, CFAMX 2019R2 Sprint 4
    • SCRUM Team:
      Brotherhood of Mutants

      Description

      Presentation that compares 2018R4 Results to 2019R1 Post Testing Defects.  Please put in a powerpoint (Google equivalent) that shows the Before and After for each metric side by side.

       

      AC:

      Google Slide that shows 2018R4 vs 2019R1 for each metric with a before and after next to each other.

      Explanation of any outliers 

       

        Attachments

          Issue Links

          There are no Sub-Tasks for this issue.

            Activity

              People

              • Assignee:
                Carlos.Pereyra Carlos Pereyra (Inactive)
                Reporter:
                neha.shah Neha Shah (Inactive)
              • Watchers:
                0 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved:

                  Time Tracking

                  Estimated:
                  Original Estimate - 26h
                  26h
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 21h 5m Time Not Required
                  21h 5m