-
Type: Story
-
Status: Closed (View Workflow)
-
Resolution: Won't Develop
-
Affects Version/s: None
-
Fix Version/s: CFA 2019R2
-
Component/s: Load Testing
-
Labels:
-
Sprint:CFAMX 2019R2 Sprint 4
-
SCRUM Team:Brotherhood of Mutants
-
Story Points:2
-
SOW (Time Tracking) Project:44918
-
Work Type Classification:Sustaining
As a developer running Load Testing I want to investigate ways to trickle/bulk load Sales Messages onto MSMQ so that I can test without detrimental impact to the environment
Notes
- Investigate methods to run load test sales load without overloading sandbox env
- On a couple (or 3) occasions the Sandbox environment has failed due to issues with MSMQ. After discussing with Ops, it was determined that our best approach would be to stagger the loading of messages rather than backing up 3M+
Acceptance Criteria
- Confirm that stories are written that document the testable changes needed to provide a process that will allow messages to be added to the queue manually/automatically from a backlog of messages
- implements
-
CFAMX-2225 Load Test Automation Execution during 2019R2
- Closed