Details

    • Sprint:
      CFAMX 2019R2 Sprint 5, CFAMX 2019R2 Hardening
    • SCRUM Team:
      Brotherhood of Mutants
    • Story Points:
      2
    • Work Type Classification:
      Sustaining

      Description

      In CFAMX-2419 research on the DLPS process revealed a potential optimization. This needs to be pushed to Trunk (R2) to ensure accuracy of DLPS and then pushed to R1 and Load Tested on Sandbox (after R1 is pushed to Prod).

      In terms of porting back to R1, we may not need to do this, based on the timelines shared by CFA, getting this into R2 may be sufficient, assuming that the importing of the Summary Forecast data provides the increase in processing time that Will hopes for

      Acceptance Criteria

      1. Load Test Results documented for the current version and the new and improved version
      2. A Full regression test of DLPS is required once this change has been implemented

      For Sandbox Load Testing:

      https://hotschedules.atlassian.net/wiki/spaces/RBCD/pages/60111325/CFA+Sandbox+Load+Testing

       

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                will.englefield Will Englefield (Inactive)
                Reporter:
                Michael.DeBinder Michael DeBinder (Inactive)
              • Watchers:
                1 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved:

                  Time Tracking

                  Estimated:
                  Original Estimate - 14.5h Original Estimate - 14.5h
                  14.5h
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 15h
                  15h

                    PagerDuty

                    Error rendering 'com.pagerduty.jira-server-plugin:PagerDuty'. Please contact your Jira administrators.