Uploaded image for project: 'CFA MX '
  1. CFA MX
  2. CFAMX-3423

Order Guide - Use Default Settings when moving from Vendor A to Vendor B

    Details

    • Sprint:
      CFAMX 2019R3 Sprint 2
    • SCRUM Team:
      Brotherhood of Mutants
    • SOW (Time Tracking) Project:
      44918
    • Work Type Classification:
      Sustaining

      Description

      As a product owner I want the Distributor Default Settings to be applied to the Vendor Entity when a restaurant moves from Vendor A to Vendor B via the Location Import

      Notes

      • This was a missed requirement
      • The process that runs as part of the I4 to create the Vendor Entity relationship uses these values when creating a Vendor Entity relationship
        • With the introduction of the InFORM Order Guide, Vendor Entity relationships can also be maintained thru the Location Import
        • When a store moves from Vendor A to Vendor B, due to changes in the Location Import, the Distributor Default Settings should be applied to any new Vendor Entity relationships

      Acceptance Criteria

      1. Confirm that when a store moves, via the Location Import, from Vendor A to Vendor B, the settings are correctly (per template) applied to the new Vendor Entity relationship
      2. Confirm that there are no changes to the process that is triggered as a part of the I4 to perform this action
      3. Confirm that a New Store with a vendor which exists in the environment, imported via the location import, correctly sets the Store-Vendor settings according to the Distributor Default Settings/Template.

      Distributor Default Settings

      Supplier Management > /MMS_HO_VendorEntityItem.aspx

        Attachments

        1. screenshot-1.png
          screenshot-1.png
          76 kB
        2. screenshot-2.png
          screenshot-2.png
          62 kB
        3. SupplierMgmt from Prod for store 00718 Bradley.jpg
          SupplierMgmt from Prod for store 00718 Bradley.jpg
          200 kB
        4. VendorSetup.png
          VendorSetup.png
          23 kB
        5. Vendor Template - MBM.jpg
          Vendor Template - MBM.jpg
          96 kB

          Issue Links

          There are no Sub-Tasks for this issue.

            Activity

              People

              • Assignee:
                will.englefield Will Englefield (Inactive)
                Reporter:
                will.englefield Will Englefield (Inactive)
              • Watchers:
                1 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved:

                  Time Tracking

                  Estimated:
                  Original Estimate - 26h 40m
                  26h 40m
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 21h 5m Time Not Required
                  21h 5m

                    PagerDuty

                    Error rendering 'com.pagerduty.jira-server-plugin:PagerDuty'. Please contact your Jira administrators.