Inform Order Guide - it doesn't assign items with future introduction date.
Audit log entry: Skipped because the item is not active for vendor: Vendor '567887' (ID: 153), Vendor Item ID 3866
Vendor Item introduction date 3/22/19, create a rule to assign apply on 3/22/19.
Scenario
- A Vendor Item was imported/created, with a future introduction date
- A rule was created in the UI for that vendor item, using the same future introduction date
- After Applying the Rule
- No rules were created for the item, as the Vendor Item was not active, per the audit log entry Skipped because the item is not active for vendor: Vendor '567887' (ID: 153), Vendor Item ID 3866
- The expectation is that the rules defined in the UI are created for the Vendor Entity Items, where the Vendor Item has an introduction date in the future
- Based on what the logs are reporting, a Vendor Item is only active if the Introduction Date is less than or equal to today and the Discontinue Date is greater than today
- I believe that we need to update the logic to say that an item is only Inactive when the Discontinue Date is today or in the Past
- This will require a change to the main Manage Vendor Item Assignment page to include items with a Future Introduction Date in the following filters:
- Items Requiring Action
- Unapplied Rules
- Unassigned Rules
- There will also be a change required to the rules engine to create rules when the Introduction Date of a Vendor Item is in the future
- implements
-
CFAMX-3704 InFORM Order Guide - Phase 2 (2019R3)
- Closed
- Is Clone Of
-
CFAMX-3250 Inform Order Guide - doesn't assign items with future introduction date
- Closed
1.
|
Review Test Scripts | Done | Soma Dixon (Inactive) |
|
|||||||
2.
|
Deploy | Done | Soma Dixon (Inactive) |
|
|||||||
3.
|
Functional Review with QA | Done | Soma Dixon (Inactive) |
|
|||||||
4.
|
DIT | Done | David Nayyar (Inactive) |
|
|||||||
5.
|
Patch back change for future introduction date | Done | David Nayyar (Inactive) |
|
|||||||
6.
|
Execute tests in R2 Environment | Done | Soma Dixon (Inactive) |
|