Uploaded image for project: 'CFA MX '
  1. CFA MX
  2. CFAMX-3949

EOM > Date Scroll does not scroll to future periods

    Details

    • Sprint:
      CFAMX 2019R3 Sprint 4, CFAMX 2019R3 Sprint 5
    • SCRUM Team:
      Brotherhood of Mutants
    • Work Type Classification:
      Sustaining

      Description

      Story
      As a user of Mark End of Month in MXC, I should not be allowed to navigate to a future Month. Currently the business period that displays is the next month after the last locked period.

      For example: If Sep 2018 was locked after the Mark Month End was completed. The page will default to October 2018. At this point the user will only be able to scroll back not forward when using the Month /Year Scroller.

      Acceptance Criteria
      Confirm the Month Date Scroller will prevent the user from advancing the Month/Year past the current un-locked Month/Year.
      Confirm the Month Date Scroller will allow the user to navigate through previous Month/Years.

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                staten.putnal Staten Putnal (Inactive)
                Reporter:
                charles.wheeler Charles Wheeler
              • Watchers:
                1 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved:

                  Time Tracking

                  Estimated:
                  Original Estimate - 6h 10m
                  6h 10m
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 5h 35m Time Not Required
                  5h 35m

                    PagerDuty

                    Error rendering 'com.pagerduty.jira-server-plugin:PagerDuty'. Please contact your Jira administrators.