Details

    • Sprint:
      CFAMX 2019R4 Sprint 2, CFAMX 2019R4 Sprint 4, CFAMX 2019R4 Hardening
    • SCRUM Team:
      Globogym Purple Cobras
    • SOW (Time Tracking) Project:
      44918
    • Work Type Classification:
      Sustaining

      Description

      As an operator I want the Item Activity page to show the Adjustments for the item that I selected so that I can start trying to figure out my inventory movement for a specific item

      Notes

      • Different inventory adjustments include:
        • Waste
        • Samples
        • Giveaways
        • Food Donations
        • from InFORM and POS
      • All of these adjustments decrement inventory so should be displayed in the Out column
      • The on hand should be updated to reflect the difference between the on hand of the row above and the adjusted quantity

      Acceptance Criteria

      1. Confirm that the transaction displayed in the grid for a Waste adjustment entered in InFORM is labeled as Adjustment-Waste (ReasonCode)
      2. Confirm that the transaction displayed in the grid for a Waste adjustment entered on the POS is labeled as Adjustment-Waste (ReasonCode)
      3. Confirm that the transaction displayed in the grid for a Sample adjustment entered in InFORM is labeled as Adjustment-Sample
      4. Confirm that the transaction displayed in the grid for a Sample adjustment entered on the POS is labeled as Adjustment-Sample
      5. Confirm that the transaction displayed in the grid for a Giveaway adjustment entered on the POS is labeled as Adjustment-Giveaway
      6. Confirm that the transaction displayed in the grid for a Food Donation adjustment entered in InFORM is labeled as Adjustment-Waste (ReasonCode)
      7. Confirm that the ReasonCode that is displayed as a part of the transaction correctly reflects the Reason Code selected when the transaction was applied
        • Note: For Samples and Giveaways this is not selected by the user, but is displayed in the UI
      8. Confirm that for Adjustment transactions the date stamp includes mm/dd/yyyy hh:mm:ss, and is the time at which the adjustment was applied, shown in local store time
      9. Confirm that the transferred quantities are displayed to two decimal places

        Attachments

        1. screenshot-1.png
          40 kB
          Will Englefield
        2. screenshot-2.png
          35 kB
          Will Englefield
        3. screenshot-3.png
          56 kB
          Gareth Leibbrandt

          Issue Links

            Activity

              People

              • Assignee:
                will.englefield Will Englefield (Inactive)
                Reporter:
                will.englefield Will Englefield (Inactive)
              • Watchers:
                0 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved:

                  Time Tracking

                  Estimated:
                  Original Estimate - 17h 40m Original Estimate - 17h 40m
                  17h 40m
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 18h 55m
                  18h 55m