Details

    • Sprint:
      CFAMX 2019R4 Sprint 2
    • SCRUM Team:
      Globogym Purple Cobras
    • SOW (Time Tracking) Project:
      44918
    • Work Type Classification:
      Sustaining

      Description

      As an operator I want to be able to update the counted values of an item after I have selected to use the option to Use On Hand Values so that I can capture accurate data for my high cost items

      Notes

      • When in Suggested Count mode allow the user to enter count data by location
      • Click on the item
      • The location data is displayed on the right hand side (in a similar format to the Correct On Hand modal in ordering)
      • The user can enter count data by location for an item, and the non editable Case On Hand is updated
      • The user can revert back to the standard count view, Actions > View Active Count
      • Mockup:

      Acceptance Criteria

      1. Confirm when a user selects an item when counting in Suggested mode, a right hand panel is displayed listing the locations for the item
      2. Confirm that data can be entered into the location fields, and is saved to the database in the same way as when data is entered in the normal count view
      3. Confirm that when count data is entered into locations, the Case On Hand, displayed in the left panel is updated to reflect the data entered
      4. Confirm that all expected/configured locations are displayed in the right hand panel

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                will.englefield Will Englefield (Inactive)
                Reporter:
                will.englefield Will Englefield (Inactive)
              • Watchers:
                0 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved:

                  Time Tracking

                  Estimated:
                  Original Estimate - 23h 40m Original Estimate - 23h 40m
                  23h 40m
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 32h 40m
                  32h 40m

                    PagerDuty

                    Error rendering 'com.pagerduty.jira-server-plugin:PagerDuty'. Please contact your Jira administrators.