Uploaded image for project: 'CFA MX '
  1. CFA MX
  2. CFAMX-8202

Workflow - Pull tabs from MMS Workflow Admin configuraton

    Details

    • Sprint:
      CFAMX 2020R2 Sprint 3, CFAMX 2020R2 Sprint 4
    • SCRUM Team:
      Brotherhood of Mutants
    • Story Points:
      8
    • Work Type Classification:
      Sustaining

      Description

      As a product owner I want the workflow tabs that are displayed in MxC to be pulled from the a workflow configured in Workflow Admin so that we can leverage the logic that is already in place for configuring workflows

      Notes

      • This story is to pull the list of workflow tasks, from MMS Workflow Admin, and display the tasks in the correct order in the workflow tabs

      Acceptance Criteria

      1. Confirm that workflow tasks configured in MMS are displayed in the MxC Workflow
      2. Confirm that workflow tasks configured in Workflow Admin are displayed in the correct order
      3. Identify any changes that are required to pilot a workflow in both MMS and MxC (stores may need to toggle between the two)
      4. Confirm that zone configuration is respected between tasks Dev Note: this happens during the Instance Creation process which will not be part of this story
      5. Pull over the description as the tab label

       

      Dev Notes:

      Here are the things I am seeing that will require additional stories:

      1) Mobile Workflow Instance Creation: As part of completing a workflow and starting a workflow for the next day, there is a MMS stack method which generates the new instance from the current template. This will need to be rewritten in the Mobile stack so that we can initiate properly.

      2) Confirmation Queries: Most of these are currently written as MMS stack code. These will have to be converted to Mobile stack or SQL SP.

      3) Clicking a Workflow button switches the state from "Not Started" to "Pending". In the MMS UI this is denoted by a slightly different shade of blue. I am not sure if this is a feature we care to carry over or not.

       

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                will.englefield Will Englefield (Inactive)
                Reporter:
                will.englefield Will Englefield (Inactive)
              • Watchers:
                0 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved:

                  Time Tracking

                  Estimated:
                  Original Estimate - 49h
                  49h
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 32h 10m Time Not Required
                  32h 10m

                    PagerDuty

                    Error rendering 'com.pagerduty.jira-server-plugin:PagerDuty'. Please contact your Jira administrators.