Uploaded image for project: 'CFA MX '
  1. CFA MX
  2. CFAMX-9001

MxC Workflow - Migrate Closing Change Fund to MxC W/F

    Details

    • Type: Story
    • Status: Closed (View Workflow)
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: CFA 2020R3
    • Component/s: None
    • Labels:
      None
    • Sprint:
      CFAMX 2020R3 Sprint 1
    • SCRUM Team:
      Brotherhood of Mutants
    • Story Points:
      1
    • Work Type Classification:
      Sustaining

      Description

      As an operator I want to be able to complete the Closing Change Fund in MxC so that I no longer have to use MMS

      Notes

      • Build out common calendar control/behavior
        • When workflow is open, and pinned open, the calendar control is not displayed on the page, instead the date is controlled by the workflow calendar
        • When the user is interacting with the page, but the workflow is not pinned open, display a read-only date and also see a calendar icon to re-open the workflow frame.
        • Note: When the page is displayed in the MMS Workflow, transition period, the date-picker should always show when the page is embedded in an iframe.
        • When page is complete, send signal to Workflow to Refresh just in case any Auto-Completion can be done.

      Acceptance Criteria

      1. Confirm that the Closing Change Fund page is representative of the date of the workflow being completed
      2. Confirm that any tasks that the Closing Change Fund task is dependent upon have to be Completed prior to starting this task
      3. Confirm when the workflow is open, and pinned open, the calendar control is not displayed on the page, instead the date is controlled by the workflow calendar
      4. Confirm when the user is interacting with the page, but the workflow is not pinned open, display a read-only date and also see a calendar icon to re-open the workflow frame
      5. Confirm when the page is displayed in the MMS Workflow, the date-picker is available when the page is embedded in an iframe
      6. Confirm that when viewing the workflow for dates beyond the current workflow date (Workflow tabs turn white), the user can select the Closing Change Fund task, but when doing so they will see a message informing that that the task cannot be completed (use the existing message)

        Attachments

          Issue Links

          There are no Sub-Tasks for this issue.

            Activity

              People

              • Assignee:
                will.englefield Will Englefield (Inactive)
                Reporter:
                will.englefield Will Englefield (Inactive)
              • Watchers:
                0 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved:

                  Time Tracking

                  Estimated:
                  Original Estimate - 12h
                  12h
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 11h Time Not Required
                  11h

                    PagerDuty

                    Error rendering 'com.pagerduty.jira-server-plugin:PagerDuty'. Please contact your Jira administrators.