Uploaded image for project: 'CFA MX '
  1. CFA MX
  2. CFAMX-9016

MxC Workflow - Migrate Paid In/Out to MxC W/F

    Details

    • Sprint:
      CFAMX 2020R3 Sprint 1, CFAMX 2020R3 Sprint 2
    • SCRUM Team:
      Brotherhood of Mutants
    • Story Points:
      1
    • Work Type Classification:
      Sustaining

      Description

      As an operator I want to be able to complete the Paid In/Out in the MxC workflow so that I no longer have to use MMS

      Notes

      • Build out common calendar control/behavior
        • When workflow is open, and pinned open, the calendar control is not displayed on the page, instead the date is controlled by the workflow calendar
        • When the user is interacting with the page, but the workflow is not pinned open, display a read-only date and also see a calendar icon to re-open the workflow frame.
        • Note: When the page is displayed in the MMS Workflow, transition period, the date-picker should always show when the page is embedded in an iframe.
        • When page is complete, send signal to Workflow to Refresh just in case any Auto-Completion can be done.

      Acceptance Criteria

      1. Confirm that the Paid In/Out page is representative of the date of the workflow being completed
      2. Confirm that any tasks that the Paid In/Out task is dependent upon have to be Completed prior to starting this task
      3. Confirm when the workflow is open, and pinned open, the calendar control is not displayed on the page, instead the date is controlled by the workflow calendar
      4. Confirm when the user is interacting with the page, but the workflow is not pinned open, display a read-only date and also see a calendar icon to re-open the workflow frame
      5. Confirm when the page is displayed in the MMS Workflow, the date-picker is available when the page is embedded in an iframe
      6. Confirm that when viewing the workflow for dates beyond the current workflow date (Workflow tabs turn white), the user can select the Paid In/Out task to navigate to a date that is different tot he current workflow date
      7. Confirm that when a Paid In/Out comes in after the day has been finalized, and the workflow is accessed for the later date, when completing this task, the user is taken back to the date of the newly uploaded Paid In/Out and is prompted to resolve the newly uploaded post dated Paid In/Out, before being able to complete the task for the current workflow date

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                will.englefield Will Englefield (Inactive)
                Reporter:
                will.englefield Will Englefield (Inactive)
              • Watchers:
                0 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved:

                  Time Tracking

                  Estimated:
                  Original Estimate - 7h Original Estimate - 7h
                  7h
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 11h 35m
                  11h 35m

                    PagerDuty

                    Error rendering 'com.pagerduty.jira-server-plugin:PagerDuty'. Please contact your Jira administrators.