Details

    • Sprint:
      CFAMX 2020R3 SA Sprint 1
    • SCRUM Team:
      Globogym Purple Cobras
    • Story Points:
      3
    • SOW (Time Tracking) Project:
      45076
    • Work Type Classification:
      Sustaining

      Description

      As an admin I want to be able to set a Processing Time for an item so that the suggested ordering algorithm can take into account he time it takes to prepare product

      Notes

      • Processing time should be entered in whole hours
      • Processing Time is initially set on Base Information
      • Store specific Processing Time can be set in Set Restaurants
      • There will be no changes to any imports to support Processing Time, it is InFORM only

      Mock ups

      • Base Information
      • Set Restaurants

      Acceptance Criteria

      1. Confirm that there is a new Processing Time field on the Base Information tab
        • Confirm that the Processing Time field is zero/null/blank by default
        • Confirm that processing time only accepts whole hours
        • Confirm that the processing time must be a positive value
        • Confirm that the max value is 48 hours
      2. Confirm that there is a new Processing Time field on the Set Restaurants tab
        • Confirm that the Processing Time field only displays in Set Restaurants if a value is configured on Base Information (As per the Suggested Item flag)
        • Confirm that processing time only accepts whole hours
        • Confirm that the processing time must be a positive value
        • Confirm that the max value is 48 hours
        • Confirm that store specific Processing Times can be set via the Wizard
      3. Confirm that when a new item is added the Processing Time is not set
      4. Confirm that when a new store is created and the Processing Time is set for an item, the resulting Entity Item has inherits that setting

        Attachments

        1. BaseInfoProcessingTime.png
          38 kB
          Will Englefield
        2. SetRestProcessingTime.png
          49 kB
          Will Englefield

          Issue Links

            Activity

              People

              • Assignee:
                will.englefield Will Englefield (Inactive)
                Reporter:
                will.englefield Will Englefield (Inactive)
              • Watchers:
                0 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved:

                  Time Tracking

                  Estimated:
                  Original Estimate - 30h Original Estimate - 30h
                  30h
                  Remaining:
                  Time Spent - 31.25h Remaining Estimate - 3h
                  3h
                  Logged:
                  Time Spent - 31.25h Remaining Estimate - 3h
                  31.25h

                    PagerDuty

                    Error rendering 'com.pagerduty.jira-server-plugin:PagerDuty'. Please contact your Jira administrators.