Uploaded image for project: 'CFA MX '
  1. CFA MX
  2. CFAMX-9849

OG - Rules Engine - Update VEIs when an End Date has been deleted

    Details

    • Sprint:
      CFAMX 2020R3 Sprint 4
    • SCRUM Team:
      Brotherhood of Mutants
    • Story Points:
      1
    • Work Type Classification:
      Sustaining

      Description

      As a user maintaining the order guide I want the rules engine to update VEI's after I have deleted the End Date of a rule (CFAMX-9844)

      Notes

      • After deleting the End Date of a rule I want the rules engine to do it's thing!

      Acceptance Criteria

      1. Confirm that after the End Date of an Include Rule has been deleted the discontinue date is removed for the corresponding Vendor Entity Items
      2. Confirm that after the End Date of an Exclude Rule has been deleted, when the job runs that re-introduces excluded items, those Vendor Entity Items are not re-introduced (as there is no longer an end date for the exclude)

        Attachments

          Issue Links

          There are no Sub-Tasks for this issue.

            Activity

              People

              • Assignee:
                will.englefield Will Englefield (Inactive)
                Reporter:
                will.englefield Will Englefield (Inactive)
              • Watchers:
                0 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved:

                  Time Tracking

                  Estimated:
                  Original Estimate - 11h
                  11h
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 3.5h Time Not Required
                  3.5h

                    PagerDuty

                    Error rendering 'com.pagerduty.jira-server-plugin:PagerDuty'. Please contact your Jira administrators.